2018These standards are published in the year - there are requirements for label identification!
2018January to the present,The relevant national departments have successively issued many standards for food products,Sorted out the content of the label identification to give you a reminder,Be prepared for label identification changes。 GB 2716-2018 Edible vegetable oil (Date of implementation.):2018-12-21) 1、Edible plant blended oil products should be named 'edible plant blended oil'。 2、The label identification of edible vegetable blended oil should indicate the proportion of various edible vegetable oils。 3、The label identification of edible vegetable blended oil can indicate the name and content of more than 2% fatty acid composition (mass fraction of total fatty acids) in the product GB 8537-2018 Drinking natural mineral water (Date of implementation:2019-6-21In addition to complying with the provisions of GB7718, the label of pre-packaged products shall be complied with,The following requirements should also be met: a)Indicate the source of natural mineral water; b)Marking the limit indicators for product compliance、Total dissolved solids as well as major cations(K+、Na+、Ca2+、Mg2+)content range; c)When the fluorine content is greater than 1.0mg/L,It should be marked with the word "fluorine".。 GB 2719-2018 Vinegar (Date of implementation.):2019-12-21) 1、The label of prepackaged vinegar should indicate the total acid content,The words "vinegar" or "sweet vinegar" should be prominently marked on the packaging label of the product。 2、Bulk vinegar should be labelled with the contents of 1 on the outside of the container or package。 GB/T 8233-2018 Sesame oil (Date of implementation.):2018-12-01) 1、Sesame oil with refined sesame oil for transparency、Moisture and volatile content, acid value、and other indicators are fixed,It is divided into primary and secondary levels。 2、The product name is identified as "sesame oil", "sesame oil", "small grinding sesame oil", "refined sesame oil" and "sesame crude oil".,shall comply with this standard。 GB/T 1354-2018 Rice (Date of implementation.):2019-05-01) 1、rice with processing precision、Broken rice and its small and medium-sized broken rice、Imperfect grain content is fixed;High-quality rice is broken rice、Machining accuracy、Chalkiness、The tasting score is fixed;Indica、Terrier rice、Premium Indica、High-quality terrier rice is divided into one grade、Level 2 and Tertiary;Indica glutinous rice、Stem glutinous rice is divided into primary and secondary grades; 2、The declared net content should be the quality of the product under the maximum allowable moisture condition。 3、It is recommended that high-quality rice be labeled with the best before date (the tasting score value is the value within the best before date of the product).。 GB 1353-2018 Corn (Date of implementation.):2019-02-01) 1、The name of the product should be indicated on the packaging or in the accompanying documents、category、grade、Origin、Year and month of harvest。 2、Genetically modified corn should be labeled in accordance with relevant national regulations。 GB/T 19883-2018 Jelly (Date of implementation.):2019-01-01) 1、The labeling of pre-packaged products shall comply with the provisions of GB 7718 and GB 28050,The label of the product sold by weighing may not indicate the net content,Other content shall comply with the provisions of GB 7718。 ...
4The case was exposed, and the central ecological and environmental protection inspectors "looked back" and were still sharp
for one month、The central ecological and environmental protection inspection of 10 provinces, including Hunan, is still in the process of "looking back".。14Japan's central ecological and environmental protection inspectors exposed two more typical cases。So far,Four cases have been publicly exposed。 Although in June of this year,The central environmental inspectorate made public 74 typical cases during the first batch of "retrospectives" in 10 provinces and regions, including Hebei,But,Judging from the typical cases that were made public in the second batch of "looking back".,In some places, perfunctory rectification and environmental violations are still prominent。The second batch of central ecological and environmental protection inspectors "looked back" and were still sharp when exposing problems。 11May 5th,The first ecological and environmental protection inspection team of the central government(Hereinafter referred to as the inspection team)After being stationed in Jilin Province to carry out "looking back".,It was found during the on-site inspection of the remediation of the black and odorous water body of the Xianren River, a first-class tributary of the Dongliao River,The source control and interception of the Xianren River is seriously lagging behind,Don't just do superficial things,River improvement "just talk but not practice",And it reproduces the "hands-off shopkeeper"。 The Fourth Ecological and Environmental Protection Supervision Group of the Central Committee(Hereinafter referred to as the inspection team)It was found during a surprise inspection of the Yunxi area of Yueyang Green Chemical Industrial Park in Hunan Province,The industrial park, which is called Green, illegally occupies the lake,Secretly draining sewage。 The Central Ecological and Environmental Protection Inspectorate pointed out,The governments and relevant regulatory authorities of the two provinces are responsible。 There are sections of the Xianren River floating garbage and manure The Xianren River has been along the river for many years、Domestic sewage and initial rainwater are mixed and discharged into the river,Add to that the silt of the river、The garbage has not been cleaned up for a long time,The Xianren River is prominently polluted,The problem of black odor continues to intensify,The masses along the coast reacted strongly。 2017August,The first round of central environmental protection inspectors not only focused on the treatment of the black and odorous water body of the Xianren River,And it was specifically raised in the feedback of the inspectors,The Xianren River pollution control project has not been implemented for a long time,The central government's subsidy of 9 million yuan was withdrawn after the deadline。thereafter,Jilin Province is required in the public rectification plan,before the end of the year,Liaoyuan City completed the relocation of the main sewage interception pipe of the Xianren River,2019Eliminate the black and odorous water body of the Xianren River by the end of December。 however,The inspection team found out when they inspected the scene,The remediation of the black and odorous water body of the Xianren River did not meet the target requirements of the remediation of the black and odorous water body,It has also not reached the orderly progress of the inspector's rectification,Doing superficial articles。 The inspection team pointed out,The proportion of rain and sewage diversion in Liaoyuan City is only 39.5%,It is well below the provincial average,It is the main reason for the black smell of the water body of the Xianren River。"But as of the time of this 'look back' stationing,Only 67% of the 12-kilometer main sewage pipe relocation project on the Xianren River, which is due to be completed by the end of 2018;A total of 73 kilometers of rain and sewage pipe network diversion and reconstruction projects should be implemented,Construction did not begin until July 2018,Only 18 kilometers were completed;The 52 rainwater and sewage outlets along the river have not yet been banned or rectified,Inspectors take samples and monitor the temporary sewage outlet on the west side of the Yongsan-gu government,The concentration of ammonia nitrogen in wastewater is as high as 20.7mg/L。The inspection team pointed out,Liaoyuan City Xianren River River Renovation "Just Say But Not Practice"。 According to the inspection team,In accordance with the requirements of the "Water Ten".,The "Work Plan for the Implementation of the Action Plan for the Prevention and Control of Water Pollution in Liaoyuan City" formulated by the Liaoyuan Municipal Government clearly requires the cleaning of garbage in the Xianren River、dredging and dredging。But "looking back" found,These jobs are just on paper,"In front of Huagang Hospital、West Bridge and other river sections,The water bodies are all seriously black and odorous,Floating garbage、Manure,Especially on both sides of the Emgrand Cabaret River,Littered with garbage,The scene was terrible."。Inspectors randomly sampled and monitored the river section of the railway bridge,Results: Ammonia nitrogen concentration 11.5mg/L,It is a black and odorous water body。The inspection team believes,2018By the end of the year, it is difficult to achieve the task of eliminating more than 80% of the black and odorous water bodies in Liaoyuan City。 "Since May 2018,The Municipal Water Conservancy Bureau implements 'dam construction and sewage interception' in the downstream river,About 5,000 tonnes of sewage intercepted from Hanoi are lifted into the municipal network by pumps daily,He also reported to the inspection team that it was able to 'minimize the direct discharge of sewage from the Dongliao River'。But the inspector found out,Liaoyuan City Sewage Treatment Plant has been overloaded for a long time,Nearly 20,000 tons of sewage are discharged directly into the Dongliao River every day in the urban area,The black and odorous sewage collected by the dam is still discharged directly into the Dongliao River after entering the municipal pipe network,Just "polluted moving",It did not have the effect of pollution control。 The inspection team also found:,The existing sewage treatment capacity in Liaoyuan City is seriously insufficient,The sewage treatment plant, which was supposed to be completed by the end of this year, had not yet begun construction by the time the "Look Back" inspectors arrived。 Yueyang Green Chemical Industrial Park was approved by the Hunan Provincial Government to set up illegal sewage,At present, more than 60 enterprises have settled in,The Yunxi area of Yueyang Green Chemical Industrial Park, which is advertised as green(Hereinafter referred to as the Chemical Industrial Park)It also did not stand up to the inspection of the inspection team。 11May 8th,In accordance with the relevant requirements of special inspectors,The inspection team conducted a surprise inspection of the Yunxi area, which is about 5 kilometers away from the main stream of the Yangtze River,Illegal occupation of lakes、Problems such as illegal discharge and sewage discharge and extensive environmental protection management have been investigated one by one。 2010September 1, year,Yueyang City began to implement the "Yueyang City Urban Water System Protection and Management Measures",It is expressly forbidden to enclose the lake for land reclamation、Cofferdam aquaculture and other acts of encroachment on urban water systems。But,The park ignores water system protection requirements,2014In 2015, no planning land use procedures were carried out,Illegal filling of lakes on the west side of Songyang Lake on the west side of the park,It covers an area of 92.5 acres。 The inspection team pointed out,After the illegal reclamation of the lake has become a fait accompli,The land use planning of the relevant areas of Yueyang City will include the illegally filled land plots into the scope of planned construction land,Let Songyang Lake be encroached on step by step。 Not only illegal lake reclamation,The inspection team found,There is also a problem of illegal discharge and sewage discharge in the park。It was not raining at the time of the on-site inspection,However, 10 of the 13 stormwater outlets are discharging wastewater with a distinct chemical odor。The inspection team took samples and monitored them,The problem of enterprise leakage and leakage is prominent,It seriously affects the water environment quality of Songyang Lake。Monitoring showed that the COD concentration in Songyang Lake was as high as 85mg/L,It is an inferior Class V water body。 The inspection team revealed,On the west side of the park、In the same area on the eastern shore of Songyang Lake,There are two plots oozing black water,The COD concentration was 483mg/L,The concentration of ammonia nitrogen was 10.38mg/L。Temporary measures have been taken in the park,The black water is collected and pumped into the Yunxi Sewage Treatment Plant for treatment,However, it is difficult to prevent black water from entering Songyang Lake。 furthermore,Due to extensive environmental management,Ammonia nitrogen discharged from tail water after treatment at Yunxi District Sewage Treatment Plant、COD concentrations sometimes exceed the standard。 Yueyang City, Liaoyuan City, was alleged to be responsible, the inspection team pointed out,As the main body of responsibility for the remediation of the black and odorous water body of the Xianren River,Liaoyuan Municipal Party Committee、The style of government rectification work is unrealistic,In the work, there is no overall planning of rain and sewage diversion transformation、measures such as remediation of sewage outlets into the river;It also did not comply with the requirements of the national "Ten Water Measures".,Timely deployment to promote the clean-up of garbage in the Xianren River、Dredging and dredging、ecological restoration and other specific work。 The Liaoyuan Municipal Government has repeatedly stated that it attaches great importance to the remediation of the black and odorous water body of the Xianren River,However, the first phase of the project such as the relocation of the sewage interception main pipe requires 500 million yuan of funds,Only 10 million yuan was disbursed,As a result, it is difficult to implement various governance measures。 The inspection team believes,The Yueyang municipal government has failed to properly handle the relationship between development and protection,In order to introduce the project,He did not hesitate to fill in the lake and occupy the lake in violation of the relevant regulations,Ask for land on the lake。 In addition to the disclosure of responsibilities at the municipal level,The inspection team also pointed out:,The implementation of "one post and two responsibilities" for ecological and environmental protection of relevant departments in Liaoyuan City is not in place,omission、Slow action。thereinto,As the leading department for the remediation of the black and odorous water body of the Xianren River,The Liaoyuan Municipal Public Utilities Bureau did not consider the remediation plan and technical route carefully、The argument is insufficient,The start of dredging and dredging is lagging behind;The Municipal Water Conservancy Bureau is in the remediation work,Temporary measures such as "damming and intercepting pollution" should be adopted,Perfunctory response to inspector rectification,A huge waste of financial funds,Inaction in the remediation of river outlets,Swap the concept、Pass the buck,52 industrial wastewater will be in the Xianren River、The mixed discharge of domestic wastewater and initial rainwater is defined as the so-called "river outlet",It is not recognized as a "river outlet" in accordance with the relevant national requirements,Remediation has also not been carried out,It even pushed the relevant regulatory responsibilities to other enterprises and institutions,Be a "hands-off shopkeeper"。 The inspection team pointed out,Yueyang Yunxi District Government and Green Chemical Industrial Park Management Committee,Turning a blind eye to illegal lake reclamation,Illegal decision-making,No effective measures have been taken for the outstanding environmental problems existing in the park,There is inaction、Slow action、Chaos as a problem;Yueyang and Yunxi two-level water affairs、Land、planning、Environmental protection and other departments do not have a good understanding of ecological and environmental protection,Failure to effectively discharge regulatory responsibilities。 source:Legal Daily Author:Xuan Jianrong statement:This website is reprinted、share、statement、Views remain neutral,The purpose is only to convey more information,The copyright belongs to the original author。If the copyright of the work is involved,Please contact us,We will remove the content as soon as possible! ...
Investigate and deal with 10 typical cases of atmospheric environmental violations
The Changzhou Municipal Environmental Protection Bureau has continued to carry out atmospheric environmental law enforcement actions this year,As of now,A total of 605 cases of atmospheric environmental violations were investigated and punished, and 10 typical cases of atmospheric environmental violations were announced,Since the beginning of this year, the Municipal Environmental Protection Bureau has strengthened environmental supervision and law enforcement,So far, a total of 605 cases of atmospheric environmental violations have been investigated and punished,The penalty amount was decided to be more than 5,700 yuan;Among them, 6 cases were punished on a daily basis,The total fine is 2.32 million yuan,68 cases were sealed and seized,11 pieces of production were suspended,41 cases were transferred to administrative detention。 At the same time, the Municipal Environmental Protection Bureau announced 10 typical cases of atmospheric environmental violations investigated and dealt with since 2018。 link:201810 typical cases of atmospheric environmental violations investigated and dealt with since the beginning of the year、4May 23rd,The Liyang Environmental Protection Bureau found that the material stacking site of a steel company in Jiangsu did not take dust prevention and control measures,In accordance with the law, the unit shall be ordered to make immediate corrections and be fined。6May 14th,When the Liyang Environmental Protection Bureau conducted a review of the unit,It was found that the illegal acts of the unit had not been corrected in place。The Liyang Environmental Protection Bureau imposed a continuous penalty on the unit on a daily basis,The total fine is $800,000。 Two、3May 5th、3June 6th,The cross-inspection team organized by the Jiangsu Provincial Environmental Protection Department and the Wujin Environmental Protection Bureau found that a building materials company in Changzhou was engaged in the production of concrete projects,Some materials are stacked in the open air,Not taken airtight、Fencing、Cover and other measures to prevent dust pollution,The Wujin Environmental Protection Bureau ordered the unit to make corrections immediately and imposed a fine in accordance with the law。3May 21st,When the Wujin Environmental Protection Bureau conducted a review of the unit,It was found that the illegal acts of the unit had not been corrected in place。The Wujin Environmental Protection Bureau imposed a continuous daily penalty on the unit,The total fine is $480,000。 Three、4May 18th,The Changzhou Environmental Protection Bureau found that building materials were stacked in the open air on the material yard of a building materials technology company in Changzhou,No effective measures have been taken to prevent and control dust pollution,In accordance with the law, the unit shall be ordered to make immediate corrections and be fined。5May 4th,When the Changzhou Municipal Environmental Protection Bureau conducted a review of the unit,It was found that the illegal acts of the unit had not been corrected in place。The Changzhou Municipal Environmental Protection Bureau imposed a continuous penalty on the unit on a daily basis,The total fine is $300,000。 Four、4May 19th,The Changzhou Environmental Protection Bureau found that the setting machine production line in the finishing workshop of a printing and dyeing company in Changzhou was in production,The supporting air pollution prevention and control facilities are not operating normally。The Changzhou Municipal Environmental Protection Bureau filed a lawsuit against the unit's pollution production facilities、The equipment is seized,At the same time, a fine of 350,000 yuan was imposed on the unit,At the same time, the case was transferred to the public security organs。 Five、5-6month,When the Changzhou Municipal Environmental Protection Bureau uniformly organizes and carries out special inspections on air pollution prevention and control,It was found that 4 units, including a plastic packaging factory in Changzhou City, Wangxia Village Area, Xinbei, involved plastic packaging processing or plastic powder drying and curing sections in the production process,Production is not carried out in a confined space,Organic waste gases such as non-methyl hydrocarbons are generated。In addition to imposing a total fine of 100,000 yuan on the above-mentioned units in accordance with the law, the New Taipei Environmental Protection Bureau imposed a total fine of 100,000 yuan,It is also required according to its industrial and other structural characteristics,Combined with the special remediation work plan for scattered pollution,Carry out special rectification of one factory and one policy,Realize the overall improvement of the environmental quality of the area。 Six、5May 14th,Changzhou Environmental Protection Bureau Economic Development District Bureau found that the high-speed mixing (dispersion) of water-based coatings of a material Co., Ltd. in Jiangsu、Hot melt of sanding sections and powder coatings、In the extrusion section, there is an exhaust gas containing volatile organic compounds in the production process,Not installed as specified、Use of air pollution prevention and control facilities,No measures have been taken to reduce emissions。The Economic Development District Bureau imposed a fine of 70,000 yuan on the unit。 Seven、8May 17th,The Bell Tower Environmental Protection Bureau found that the doors and windows of an electrical appliance company in Changzhou were open when the resin was stirred;There is no exhaust gas treatment device installed in the resin packaging section。The Zhonglou Environmental Protection Bureau imposed a fine of 100,000 yuan on the unit's illegal acts。 Eight、5May 24th,Tianning Environmental Protection Bureau found that a stainless steel products Co., Ltd. in Changzhou was producing,Tested,The concentration of odors emitted by the fugitive body of the unit、Perimeter concentrations of nitrogen oxides emitted by fugitives、The odor concentration in the exhaust cylinder of the pickling section exceeded the standard。The Tianning Environmental Protection Bureau fined the unit 150,000 yuan,and ordered to limit production for 1 month。 Nine、1May 10th。The Jintan Environmental Protection Bureau found that the smoke and dust emission concentration in the exhaust of the mechanical shaft kiln of a building materials Co., Ltd. in Jintan, Changzhou City, did not meet the emission standards。The Jintan Environmental Protection Bureau imposed a fine of 100,000 yuan on the unit,and ordered it to make corrections immediately。 Ten、3May 14th,Wujin Environmental Protection Bureau found that a refrigeration equipment Co., Ltd. in Changzhou was engaged in the production of cold storage board projects,Its projects use isocyanates in their production、Combined polyethers。Monitored,The finished cold storage board of the unit contains ozone-depleting substances。The unit did not apply for an ozone-depleting substance quota permit from the environmental protection department。The Wujin Environmental Protection Bureau fined the unit 200,000 yuan。 source:Changzhou Evening News (Sun Xueyun Tang Yichen) statement:This website is reprinted、share、statement、Views remain neutral,The purpose is only to convey more information,The copyright belongs to the original author。If the copyright of the work is involved,Please contact us,We will remove the content as soon as possible! ...
