Henan Minyuan Special Steel Co., Ltd:
你公司报送的由河南江河环境科技有限公司编制完成的《河南闽源特钢有限公司1500立方米高炉1座及相关配套设施建设项目环境影响报告书》(以下简称《报告书》)收悉。Technically reviewed,The following main problems were identified in the Report of the project:
1. The report does not analyze the construction of this project and the planning of Yongcheng Iron and Steel Casting Professional Park、Planning EIA and review opinions、Consistency of environmental access and other relevant contents。
2. The determination of the sanitary protection distance of the whole plant needs to be further analyzed and demonstrated。The report is based on TSP fugitive emissions、The unorganized non-point source area is calculated to determine the sanitary protection distance of the whole plant,专家认为应按照《炼铁厂卫生防护距离标准》(GB/T 11660-1989)、"Sanitary Protection Distance in the Non-metallic Mineral Products Industry Part 2". : Lime manufacturing industry (GB/T 18068.2-2012),综合考虑PM10、CO pollution factor,Reasonably determine the health protection distance of the project。
3. 《报告书》现状监测缺少土壤二噁英环境质量现状监测content。
4. 《报告书》环境空气预测章节缺少PM2.5的预测内容。
Accordingly,我厅决定退回该项目的环评文件。After the above issues are resolved,Your company can submit the EIA document for approval of the project again in accordance with the prescribed procedures。Without the approval of our office,The project shall not start construction without authorization。
2018November 29
抄送:Yongcheng Environmental Protection Bureau,河南江河环境科技有限公司
河南省环境保护厅办公室2018年11月29日印发