1°C minmin! Sleet! A cold spell is coming,How should workers prevent coagulation、Antifreeze?

  十二月上旬 是冷空气的舞台! 看他携着 【大风】 【降温】 【雨雪】 等一众小弟 正快马加鞭地赶来啦~~~ 根据昆山气象12月6日发布的气象通知, The minimum temperature in our city in 48 hours can drop by 8~9 °C, 8日早晨最低气温可达1°C左右! 另外,The snow you've been waiting for for years may be coming soon, Xiao An has nothing to ask for either, Only...... Let's wear cotton clothes and pants, Don't fight mom who thinks you're cold, 毕竟这次是真的冷…… 寒潮来袭工厂应该如何防凝防冻呢? 冻结后又该如何处理呢? 一起来看看 工厂管线的冬季防冻及处置 1.工艺用的水线。Everything that is installed on the ground,And the water consumption is not large,Ensure that there is a vent valve at the end of the pipeline,Keep running water,to prevent freezing,If conditions permit, insulation should be added to the pipeline。 2.Intermittent use of waterlines。An electric heat trace must be added for insulation,Otherwise, it will not be available。 3.A waterline that is not used in winter。The flanges on both sides should be taken apart,Drain all the stored water,Conditional,Purging with industrial air to ensure that the stagnant water in the pipeline is not filled,If the switch is not tight,Blind plates should be added at the flanges that are disassembled at both ends,And carry out registration and listing。 4.For some pipelines that are not used in normal production。Due to long-term inactivity,There may be stagnant water in the dead spot and freeze,Once you want to use,It will cause a blockage,and affect production。on such pipelines before the onset of winter,After the pipeline is dredged and replaced with the appropriate flow rate,Close the valve in question,Stay on standby。 5.Fire hydrants for fire waterline systems,Fire waterline, valve well, etc。To close the valve inside the valve well,Put water in the water purification faucet,Ensure that the water hydrant is ready for use at any time。Double-layer manhole cover should be used in the fire well (one of which is a thermal insulation manhole cover)。   发生冻结处理 设备冻结后,Apply steam or hot water to thaw,Cast iron pipes and equipment should be thawed slowly,to prevent bursting,Freeze-cracked pipelines or equipment are prohibited from heating in a sealed state,It should be opened first,Defrost the transverse tube from low to high,Vertical tubes from top to bottom,If there is a crack, it should be reported。 工厂防冻小知识 1.做好个人防护工作,Dress warmly,During the inspection of the device, do a good job of anti-skid work on the tower and down the tower。 2.Strengthen the dehydration work, drain the water of each dehydration point in time, and prevent freezing and blockage。 3.注意仪表液位计现场的液位计上下部角阀有一个出现冻堵将会影响到真实的液位,The freezing plug at the head of the remote level gauge will affect the mechanical rotation,Current conduction,Affects the true liquid level。 4.The temperature of the circulating water is not easy to control too low,It cannot be lower than 8 degrees,After below an octave,It will cause the freeze plugging phenomenon of the cooler secondary line,In severe cases, the pipeline is frozen and cracked。 5.Insulation of pipelines in the dead water area of circulating water in the workshop;The circulating water pump that has been deactivated adopts a backflow measure,and put it clean。 6.Equipment that is out of service on the shop floor,as:Make-up pump、Circulating water pump、cooler、condenser, etc,Water discharge should be used、Regular inspection and other measures。Compressor cooling water,Regularly inspected by the operator,Make sure the water valve remains open for a long time。 7.If there is a freeze plug in the liquid hydrocarbon line,When steam purging the line,Watch out for physical explosions,Do not force purging,Warm up slowly。 8.The on-site pressure gauge will also appear to be frozen and blocked,Judge from experience。If it is uncertain, it should be reported and dealt with in a timely manner。 9.When purging freeze-plugging pipelines,Purge the elbow with steam。 10.Pay attention to the enhanced dehydration of natural gas pipelines,so that liquids are not brought into the boiler。Check the natural gas line to prevent the crystal structure caused by freezing。 11.Strengthen inspections and check the temperature at each point。 12.Raw water pipelines should be avoided from being shut down,Maintain a long flow of water。 13.Retired devices,Blind plates should be added at the connection between the pipeline and the production system,and drain the stagnant water,Purge clean。Equipment that is idle in the open air and equipment that is open,Prevent water, snow, freezing, and damage to the equipment。Open-air equipment needs to increase the number of patrol inspections and loading。 14.All production and living and temporarily out of service equipment,Water vapor pipelines,The control valve should have anti-freezing and thermal insulation measures,Drain the stored water cleanly or maintain a small amount of long-term water flow、Small over-steam approach,To meet the requirements of both anti-freeze and saving,Be sure to clean it after the water and steam are stopped。 15.Strengthen patrols to check for dehydration,Check the dehydration at the low point of each equipment and the low point of the pipeline,The pump cooling water cannot be interrupted,Heat tracing、Keep the heating unblocked,Pressure gauge、The level gauge should be checked frequently、Steam & Water Hose Fittings、Shake your head、Keep the constant steam and running water。 16.Valves that do not move cannot be hard switched,The motorized disc does not move the car,Must not be enabled。 17.Freeze-solidified cast iron valves are slowly heated with warm water or a small amount of steam,Protects against sudden heat damage。 18.Construction and domestic water,Try to drain into a trench or a place that does not interfere with traffic,Ice skates should be knocked off at any time。 19.Strengthen management and establish anti-freezing and anti-condensation ledgers(Accident registration is included、The anti-freeze and anti-condensation equipment is in good condition、Freeze-prone condensation pipelines, etc)。 20.Valve wells at low temperatures、fire hydrant、Pipe grooves should be inspected one by one,Drain the stagnant water,Take anti-freeze and heat preservation measures。 21.It is strictly forbidden to use high-pressure steam for heating,Strictly prevent high-pressure steam from entering the low-pressure system。high、Low-pressure steam return pipes are not allowed to collude with each other。A pressure reducing valve should be installed on the radiator pipeline for steam heating,The pressure gauge used in the pressure reducing valve must be calibrated and qualified,The radiator should be tested for steam leakage before it can be used。 22.Where climbing operations are carried out,It is important to be aware of all standing water in the workplace、snow cover、It can only be carried out after ice accumulation。 23.So the steam lines (except for fire steam) close the root valve,Shut-off wall valve,Open all vent valves to drain the stored water,Purge with nitrogen。 24.All decorating points need to be discharged every hour。 25.After the circulating water system is stopped, the low point needs to be emptied, opened and drained of all water,Blow it clean with the wind。 26.Adsorption tower outside the workshop、Scrubber towers、Washing tower、Gas-liquid separator blowdown line,Freeze protection is carried out with electric heat tracing。Water separator in the workshop、The cooler is drained in time after the cooler is stopped。 27.Tap water in the workshop when the room heating is stopped、Eyewashes、Fire boxes and other safety facilities,Adopt electric companion antifreeze。 28.Workshop floor、If sprayed on the platform after water,Clean up immediately,In case of freezing。Workshop personnel when they are on the platform and climbing the stairs,Improve safety awareness and prevention awareness。 Formulate an anti-freeze management system 1、制定具有可操作性的防冻管理制度 要实行责任区防冻负责制,Implement the anti-freezing responsibility system to specific teams and specific positions;Establish and improve the anti-freezing and anti-condensation ledger,Including freeze condensation accident registration、Freeze protection of the device、The condition of the freezing-free condensation pipeline, etc。Before the frost protection period arrives,The team should fully prepare for anti-freezing,Conscientiously implement various anti-freezing measures,Do a good freeze check,Avoid the occurrence or expansion of frost。 During the anti-freezing period, each team is responsible for the anti-freezing work of each post on duty,It is also responsible for the anti-freeze responsibility area of the class during the entire anti-freeze period;The area of responsibility for anti-freezing shall include all animals in the area、Static devices,pipeline,valve,and heat trace pipes、Traps、Utility stations,Wait a minute。 2、加强防冻工作的宣传教育与培训 班长要班前强调,Supervision and inspection in the class,Wrap-up after class,Conduct timely inspection, evaluation and operation guidance for team employees。Every employee of the team should attach great importance to and be responsible for the anti-freezing work,Post operators should pay attention to anti-freezing inspection when inspecting,If you find that the freezing situation is found, you should deal with it in time,If it cannot be eliminated in time, it must be reported in a timely manner,Avoid the expansion of the freeze。 3、When handing over shifts, the anti-freezing work should be taken as an important part of the handover Read More …