The EIA filing and review are not strictly controlled,Director of the Environmental Protection Agency、Deputy Director、The deputy head of the supervision team was held accountable!Director of the Environmental Protection Agency、The chief engineer was held accountable‖ the former captain of the environmental inspection was double-opened、indict

source:Linfen Commission for Discipline Inspection website The Linfen Municipal Commission for Discipline Inspection and Supervision has publicly exposed 5 typical cases in the field of environmental protection since 2017,Discipline inspection and supervision organs at all levels in the city actively perform the duties of supervision, discipline enforcement, accountability, supervision, investigation and disposal in the field of environmental protection,A number of cases of violation of discipline and law and dereliction of duty and responsibility behind the problems of harming the ecological environment have been seriously investigated and dealt with。Recently,The Linfen Municipal Commission for Discipline Inspection and Supervision publicly exposed 5 of these typical cases。respectively: 1.Former Secretary of the Party Branch of the Environmental Inspection Team of Linfen Economic Development Zone、Former captain Wang Zhigang,Shao Chuanlan, a staff member of the Linfen Municipal Agricultural Committee, took special subsidy funds for national boiler renovation and other issues。2016July,Wang Zhigang is in the special treatment work of boiler transformation,Shanxi Jinyi Agricultural Fertilizer Co., Ltd., which uses his nephew and son-in-law Shao Chuanlan as a legal person, and Linfen Qingzheng Wastewater Treatment Environmental Engineering Co., Ltd., which his sister Wang Moumou is a legal person,Adopt false claims and fraudulent claims,Together with Shao Chuanlan and others, he defrauded the national boiler renovation special subsidy fund of 1.4 million yuan and took it for himself;2016October,Wang Zhigang in the 2016 winter heating period of soot pollution special control work,The 5.3345 million yuan raised by the clean coke user was not handed over to the special account,And the remaining 1.6567 million yuan after paying the purchase price and delivery fee of clean coke will be taken as his own;2016to 2017,Wang Zhigang accepted the clean coke distribution company、The boiler supply and installation company bribed 1.4 million yuan,Solicited a bribe of 110,000 yuan from a coal-fired boiler renovation unit。2018August,Wang Zhigang was expelled from the party、Dismissal from public office,Shao Chuanlan was expelled from the party,The issue of the two of them suspected of crimes abusing public office was transferred to the procuratorate for review and prosecution in accordance with law。 2.Former Deputy Minister of the Armed Forces Department of Taotangyu Township, Huozhou City、Liu Sanhu, the former liaison for clean coal replacement work,Li Baoping, former deputy secretary of the Party branch of Biqiang Village, Taotangyu Township, took the issue of replacing clean coal。2018January,Liu Sanhu、Li Baoping teamed up with villager Wu,Employing methods such as falsely listing villagers' application forms,172 tonnes of clean coal were replaced with 400 tonnes of slime purchased in advance,Illegal profits of 114,440 yuan and possession of themselves。Li Baoping also had other disciplinary problems。2018July,Liu Sanhu、Li Baoping was expelled from the party,The issue of the two of them suspected of crimes abusing public office was transferred to the procuratorate for review and prosecution in accordance with law,The proceeds of the violation of discipline are being recovered。 3.Secretary of the Party Leadership Group of Yicheng County Environmental Protection Bureau、Director Li Weiyue,Deputy Director Li Jianmin was held accountable for his lax handling of environmental impact assessment reporting procedures by Hou Yi, deputy head of the Environmental Protection Bureau's supervision team。2016December,Hou Yi is in the process of going through the EIA filing procedures,The audit is not strictly controlled,As a result, Shengda Coal Co., Ltd. used a false land lease agreement and a gangue discharge agreement to prove that it had been put into production and operation,Handled the EIA filing procedures for the 600,000-ton coal washing project。2018May of the year,Hou Yi was punished with a government affairs warning。Li Weiyue is the party secretary of the Environmental Protection Bureau、managing director,Li Jianmin is the deputy director in charge of environmental supervision,Regulation is not in place,As a result, the party's environmental protection policy has not been effectively implemented,There is the main leadership responsibility for this。meantime,Li Weiyue、Li Jianmin also had other disciplinary problems。2018May of the year,Li Weiyue was punished with a warning from the party,Li Jianmin was given a serious warning by the party。 4.Secretary of the Party Leadership Group of Quwo County Environmental Protection Bureau、Director Ge Hongsheng,Chief engineer Zhang Jianhua was held accountable for illegal pollution discharge by the company。2016May to December,Haijian Water Glass Co., Ltd. in Quwo County、Shanxi Liheng Coking Co., Ltd、Shanxi Liheng Iron and Steel Group Co., Ltd、Samsung Foundry Co., Ltd. and other enterprises have illegal pollutant discharge、Coke is stacked haphazardly、Problems such as not installing wind and dust suppression nets,Ge Hongsheng is the party secretary of the Environmental Protection Bureau、managing director,Zhang Jianhua is the leader in charge of environmental supervision,Inadequate supervision of enterprises,As a result, the party's environmental protection policy has not been effectively implemented,There is the main leadership responsibility for this。2017February,Ge Hongsheng was given a warning,2017June,Zhang Jianhua was given a warning。 5.Li Xiangmin, director of the Labor and Social Security Office of Xintian Township, Houma City, and head of the second-level environmental protection grid in the Qincun area of Xintian Township, was held accountable for the burning of garbage in his jurisdiction。2018May 30,Garbage incineration occurred in the original abandoned site of Qincun South Power Plant in Xintian Township, Houma City,Causing environmental pollution。Li Xiangmin is the person in charge of the second-level environmental protection grid in the Qincun area of Xintian Township,Failure to perform duties,As a result, the party's environmental protection policy has not been effectively implemented。2018June,Li Xiangmin was admonished and dealt with。 The above 5 cases of violation of discipline and law and dereliction of duty in the field of environmental protection,It reflects the current situation of attaching great importance to ecological and environmental protection,There are still some units and party members and cadres whose political standing is not high、The concept of the overall situation is not strong,Indifference to responsibility,The implementation of higher-level decisions and deployments is not resolute、Not thoroughly,Don't even stop、Not astringent,In the process of environmental protection project implementation, "stretch out the black hand" and "move the cheese",Harming the vital interests of the masses,Affect the overall situation of ecological and environmental protection。Party organizations at all levels should earnestly study Xi Jinping Thought on Ecological Civilization,Firmly establish the concept of "lucid waters and lush mountains are invaluable assets".,Resolutely unify thoughts and actions with the decision-making and deployment of the central and provincial and municipal governments on the construction of ecological civilization。It is necessary to strengthen warning education,Timely reminders,Strengthen supervision,Supervise the performance of responsibilities,Focus on key areas of environmental protection、Key issues and weaknesses,In particular, the environmental protection issues assigned by the environmental protection inspection team of the central and provincial party committees and provincial governments,Conscientiously and promptly grasp the investigation, handling, rectification and implementation and other related work。The broad masses of party members and cadres must profoundly learn a lesson,Draw inferences,learn a lesson from,Earnestly perform the corresponding duties of environmental protection and pollution control,It is the responsibility to defend the territory、Defending the land is responsible、Defend the land and do your duty。Discipline inspection and supervision organs at all levels should strengthen supervision and discipline enforcement accountability in the field of environmental protection,Strictly investigate and deal with corruption and arbitrage in the battle against pollution、Take the opportunity to make money,The statement is multi-toned and high-pitched、Lack of action and poor implementation,Yang is against yin、finagle,Failure to fulfill responsibilities、Corruption and work style problems in the field of environmental protection, such as lax supervision,Provide a strong disciplinary guarantee for the city to win the battle of environmental protection and pollution control。 http://www.lfdi.gov.cn/ttxw/12907.html

The Energy Bureau announced the abolition of 204 recommended industry standards in the energy field、Suspend 99 recommended industry standard plans in the energy sector

Recently, the Energy Bureau released Document No. 9 of 2018,Announced the abolition of a number of recommended industry standards in the energy field and the suspension of a number of recommended industry standard plans in the energy field。JJG is included in the content(petroleum)07- 1999204 recommended industry standards in the energy field, such as "Verification Regulations for Mechanical Downhole Pressure Gauges".,Suspend 99 recommended industry standard plans in the energy field, such as the "Anti-interference Test Regulations for Secondary Equipment of Substations of 750kV and above".。

Units have been decoupled、Qualifications have been cancelled,Problem,Deal with the EIA as it is! Ministry of Environment:These EIA units and EIArs are dealt with

source:Ministry of Ecology and Environment, General Office of the Ministry of Ecology and Environment, Environmental Impact Assessment Letter[2018]910No. 2017 National Environmental Impact Assessment Document Technical Review Problems and Handling Opinions (Second Batch) Circular of the provinces、Autonomous regions、Environmental Protection Departments (Bureaus) of Municipalities Directly under the Central Government,Environmental Protection Bureau of Xinjiang Production and Construction Corps,All relevant environmental impact assessment institutions and personnel: In order to implement the reform requirements of "delegating power, delegating power, delegating power, and providing services".,Strengthen the guidance of EIA approval business and supervision during and after the event,According to the requirements of the "Notice on Carrying out the Technical Review of the 2017 National Environmental Impact Assessment Documents" (Environmental Impact Assessment Letter [2017] No. 677).,Our ministry organized and completed the second batch of 16 provinces (regions).、Municipal level of ecology and environment departments and other examination and approval departments approved 274 construction project environmental impact report (form) technical review work。Reviewed,It was found that there were major problems in the environmental impact reports (forms) of 16 construction projects。 According to the relevant provisions of the "Measures for the Management of Environmental Impact Assessment Qualifications for Construction Projects" (Order No. 36 of the Ministry of Environmental Protection).,8 EIA agencies (another 4 have been decoupled or cancelled,no longer processed) and 19 EIA Engineers for administrative action。thereinto,The EIA document was ordered to omit the main environmental protection objectives、The three EIA agencies and four EIA engineers were given a deadline of 12 months to rectify the problems such as the lack of major environmental protection measures;5 EIA institutions and 15 EIA engineers were ordered to rectify the EIA documents within a period of 6 months if they had problems such as the analysis of the construction project engineering or the wrong status monitoring data cited by the construction project。Please refer to the attachment for details of the relevant issues and handling opinions。 The rectification period shall be calculated from the date of issuance of this circular,The relevant information shall be recorded in the integrity system of the national EIA agency and the EIA engineer。The EIA agency that is ordered to rectify within a time limit,During the rectification period, the competent departments of ecology and environment at all levels shall not accept applications for examination and approval of the environmental impact reports (forms) prepared by them;After the expiration of the rectification period,The above-mentioned institutions shall submit a report on the rectification situation to our ministry。The EIA engineer who is ordered to rectify within a time limit,During the rectification period, the competent departments of ecology and environment at all levels shall not accept applications for examination and approval of environmental impact reports (forms) prepared by them as the presiding officer and the main compiler。 The above-mentioned institutions and personnel have objections to the handling opinions,You can apply to our department for administrative reconsideration within 60 days from the date of receipt of this circular,An administrative lawsuit may also be filed in accordance with law within 6 months from the date of receipt of this circular。 The competent departments of ecology and environment at all levels shall review and discover major problems that affect the conclusion of examination and approval,Effective measures should be taken to avoid the significant impact of project construction on the environment。 annex:2017Problems found in the technical review of the annual national environmental impact assessment documents and their handling opinions (second batch) General Office of the Ministry of Ecology and Environment August 30, 2018 cc:Environmental Engineering Assessment Center。 http://www.mee.gov.cn/gkml/sthjbgw/stbgth/201809/t20180905_548931.htm

Jiangsu has carried out a large-scale inventory of environmental monitoring institutions | 22 companies were punished,4HomeSuspend the issuance of data!

source:Jiangsu Environmental Protection recently,The Provincial Environmental Protection Department and the Provincial Quality Supervision Bureau jointly carried out a special inspection of the quality of environmental testing institutions in the province in the first half of 2018。 2018From May to June, the environmental protection bureau of each city divided into districts、The Quality Supervision Bureau organized a total of 311 environmental testing institutions in its jurisdiction to carry out self-inspection and self-correction of testing quality。 6On the 19th and 22nd of the month, the Provincial Environmental Protection Department, together with the Provincial Quality Supervision Bureau, in accordance with the principle of "double random".,Special supervision and inspection were carried out on 22 environmental testing institutions。   meantime,Internal management of each testing institution、Record reports、Quality system、Technical capabilities、On-site inspections were carried out in terms of value traceability。 Pass a special inspection,It is found that the environmental testing institutions mainly have the following problems: ✦ One is change、The filing is not timely。Top management、Authorized Signatory、Methodological standards, etc. have not been changed in a timely manner、Reporting。 ✦ Second, the test items or methods are out of range。The analysis project exceeds the scope of qualification certification or the analysis method exceeds the scope of application。 ✦ Third, there are defects in data traceability。The logical relationship between the data is not reasonable、The spectrum is missing、Sample expiration analysis,The methodology of the electronic version and the paper version of some institutions is inconsistent,The original recorded data is inconsistent with the recorded data of the instrument, etc。 ✦ Fourth, the implementation of subcontract management is not comprehensive。Subcontracting is more casual,Relevant information is missing。 ✦ Fifth, insufficient resource allocation、Non-normative。Pre-treatment equipment、The number of reference materials, etc., is not suitable for the detection work。 ✦ Sixth, the analysis operation is not standardized。Project monitoring is not fully carried out in accordance with the standard specifications。 ✦ Seventh, quality control measures are not in place。Lack of quality control tools,Use of instruments and equipment、Sample management, etc., do not meet the requirements of the specification。 ✦ Eighth, internal audit、The management evaluation is not in place。Internal audit、The number of participants in the management assessment is small,Mere formality,Implementation is not in place。 thereinto: Nanjing Baiyun Environmental Technology Group Co., Ltd. and other 4 testing institutions were ordered to rectify,and a fine of less than 10,000 yuan,During the rectification period,Inspection and testing data with evidentiary effect shall not be issued to the public、outcome; 10 testing institutions, including Jiangsu CTI Product Standard Testing and Certification Technology Co., Ltd., were ordered to make corrections within one month,Failure to make corrections within the time limit or failure to meet the requirements after corrections,A fine of less than 10,000 yuan shall be imposed; Six testing institutions, including the Liuhe District Environmental Monitoring Station in Nanjing, were ordered to rectify themselves; Nanjing Liankai Environmental Testing Technology Co., Ltd. and other 2 testing institutions were handed over to the local market supervision department for processing, and the environmental protection bureaus and quality supervision bureaus of districted cities will be based on the results of this inspection,Punishment shall be given to testing institutions that discover problems within their jurisdiction in accordance with law,And follow up and inspect its rectification。 Provincial Environmental Protection Department and Provincial Quality Supervision Bureau requirements,All environmental testing institutions should attach great importance to the problems found in the special inspection,Carefully comb、Analyze the causes,Draw inferences,Comprehensive rectification,Implement quality control measures,Establish and improve the quality management system,Comprehensively improve the quality of monitoring data,Ensure the scientific nature of the monitoring data、Accuracy and authenticity。 Jiangsu Province 2018 (first half of the year) provincial environmental testing institutions testing quality special inspection results Serial number Name of the institution Main problems found Handling opinions 1 The environmental monitoring station of Liuhe District, Nanjing City, has non-standard internal management and self-rectification 2 Wuxi Taihelan Monitoring Technology Co., Ltd. did not use the instrument status indicator correctly,Internal management is not standardized 3 Jiangsu Kangda Testing Technology Co., Ltd. There is a risk of cross-interference in the environmental conditions of the VOC analysis room 4 The internal management of Yangzhong Environmental Monitoring Station is not standardized 5 The internal management of Yizheng Environmental Monitoring Station is not standardized 6 Jiangsu Guozheng Testing Co., Ltd. internal management is not standardized 7 Jiangsu CTI Product Standard Testing and Certification Technology Co., Ltd. The original record information of moisture is incomplete,Report No. EDD50J000786a,Lack of original record of sample moisture,Soil nitrate nitrogen is not frozen in accordance with the prescribed method, and it is ordered to be corrected within 1 month;Failure to make corrections within the time limit or failure to meet the requirements after corrections,The market regulation department shall impose a fine of less than 10,000 yuan 8 Jiangsu Guoheng Testing Co., Ltd. JSGHEL2017468 report,Ethylene oxide from exhaust gases、acetic acid、Improper use of trimethylamine and other project standards 9 Changzhou Jialan Environmental Testing Co., Ltd. burettes and other measuring equipment have not been verified,Internal management is not standardized 10 Jiangsu Youlian Testing Technology Service Co., Ltd. Some of the original record information is incomplete,Internal management is not standardized 11 Wuxi China Securities Testing Technology Co., Ltd Read More …