Jiangsu has carried out a large-scale inventory of environmental monitoring institutions | 22 companies were punished,4HomeSuspend the issuance of data!

source:Jiangsu Environmental Protection recently,The Provincial Environmental Protection Department and the Provincial Quality Supervision Bureau jointly carried out a special inspection of the quality of environmental testing institutions in the province in the first half of 2018。 2018From May to June, the environmental protection bureau of each city divided into districts、The Quality Supervision Bureau organized a total of 311 environmental testing institutions in its jurisdiction to carry out self-inspection and self-correction of testing quality。 6On the 19th and 22nd of the month, the Provincial Environmental Protection Department, together with the Provincial Quality Supervision Bureau, in accordance with the principle of "double random".,Special supervision and inspection were carried out on 22 environmental testing institutions。   meantime,Internal management of each testing institution、Record reports、Quality system、Technical capabilities、On-site inspections were carried out in terms of value traceability。 Pass a special inspection,It is found that the environmental testing institutions mainly have the following problems: ✦ One is change、The filing is not timely。Top management、Authorized Signatory、Methodological standards, etc. have not been changed in a timely manner、Reporting。 ✦ Second, the test items or methods are out of range。The analysis project exceeds the scope of qualification certification or the analysis method exceeds the scope of application。 ✦ Third, there are defects in data traceability。The logical relationship between the data is not reasonable、The spectrum is missing、Sample expiration analysis,The methodology of the electronic version and the paper version of some institutions is inconsistent,The original recorded data is inconsistent with the recorded data of the instrument, etc。 ✦ Fourth, the implementation of subcontract management is not comprehensive。Subcontracting is more casual,Relevant information is missing。 ✦ Fifth, insufficient resource allocation、Non-normative。Pre-treatment equipment、The number of reference materials, etc., is not suitable for the detection work。 ✦ Sixth, the analysis operation is not standardized。Project monitoring is not fully carried out in accordance with the standard specifications。 ✦ Seventh, quality control measures are not in place。Lack of quality control tools,Use of instruments and equipment、Sample management, etc., do not meet the requirements of the specification。 ✦ Eighth, internal audit、The management evaluation is not in place。Internal audit、The number of participants in the management assessment is small,Mere formality,Implementation is not in place。 thereinto: Nanjing Baiyun Environmental Technology Group Co., Ltd. and other 4 testing institutions were ordered to rectify,and a fine of less than 10,000 yuan,During the rectification period,Inspection and testing data with evidentiary effect shall not be issued to the public、outcome; 10 testing institutions, including Jiangsu CTI Product Standard Testing and Certification Technology Co., Ltd., were ordered to make corrections within one month,Failure to make corrections within the time limit or failure to meet the requirements after corrections,A fine of less than 10,000 yuan shall be imposed; Six testing institutions, including the Liuhe District Environmental Monitoring Station in Nanjing, were ordered to rectify themselves; Nanjing Liankai Environmental Testing Technology Co., Ltd. and other 2 testing institutions were handed over to the local market supervision department for processing, and the environmental protection bureaus and quality supervision bureaus of districted cities will be based on the results of this inspection,Punishment shall be given to testing institutions that discover problems within their jurisdiction in accordance with law,And follow up and inspect its rectification。 Provincial Environmental Protection Department and Provincial Quality Supervision Bureau requirements,All environmental testing institutions should attach great importance to the problems found in the special inspection,Carefully comb、Analyze the causes,Draw inferences,Comprehensive rectification,Implement quality control measures,Establish and improve the quality management system,Comprehensively improve the quality of monitoring data,Ensure the scientific nature of the monitoring data、Accuracy and authenticity。 Jiangsu Province 2018 (first half of the year) provincial environmental testing institutions testing quality special inspection results Serial number Name of the institution Main problems found Handling opinions 1 The environmental monitoring station of Liuhe District, Nanjing City, has non-standard internal management and self-rectification 2 Wuxi Taihelan Monitoring Technology Co., Ltd. did not use the instrument status indicator correctly,Internal management is not standardized 3 Jiangsu Kangda Testing Technology Co., Ltd. There is a risk of cross-interference in the environmental conditions of the VOC analysis room 4 The internal management of Yangzhong Environmental Monitoring Station is not standardized 5 The internal management of Yizheng Environmental Monitoring Station is not standardized 6 Jiangsu Guozheng Testing Co., Ltd. internal management is not standardized 7 Jiangsu CTI Product Standard Testing and Certification Technology Co., Ltd. The original record information of moisture is incomplete,Report No. EDD50J000786a,Lack of original record of sample moisture,Soil nitrate nitrogen is not frozen in accordance with the prescribed method, and it is ordered to be corrected within 1 month;Failure to make corrections within the time limit or failure to meet the requirements after corrections,The market regulation department shall impose a fine of less than 10,000 yuan 8 Jiangsu Guoheng Testing Co., Ltd. JSGHEL2017468 report,Ethylene oxide from exhaust gases、acetic acid、Improper use of trimethylamine and other project standards 9 Changzhou Jialan Environmental Testing Co., Ltd. burettes and other measuring equipment have not been verified,Internal management is not standardized 10 Jiangsu Youlian Testing Technology Service Co., Ltd. Some of the original record information is incomplete,Internal management is not standardized 11 Wuxi China Securities Testing Technology Co., Ltd Read More …

Spicy strips are not qualified - let me say a few words!

recently,A food and drug administration sampling announcement said,Multiple brands of spicy strip preservatives are unqualified。afterwards,The company argues that it is legal and compliant。 One、Sampling of unqualified preservatives and their safety: (1) The unqualified items of the spicy strips in this sampling inspection are the use of preservatives - "potassium sorbate" and "sodium dehydroacetate"。 (2) The safety of "potassium sorbate" and "sodium dehydroacetate" is not in question。Don't hype this up in the media,Talk about it! Two、What is the problem and the solution (1) Classification is the problem: 1、The classification of "authoritative" at the top of the official hierarchy: (1) General Administration: The "Notice on Strictly Strengthening the Supervision of Snack Foods such as Seasoned Noodle Products" issued by the former Food and Drug Administration in 2015 has been clarified,Spicy strips and seasoned noodle products,Classified according to instant rice and flour products。Potassium sorbate and sodium dehydroacetate are not allowed to be added to 2760 seasoned noodle products。Know that 2760 is the basic standard!! (2) The attitude of the Health and Family Planning Commission: If it is said,The Food and Drug Administration is not authoritative enough,The National Health and Family Planning Commission (NHFPC) has made it clear in the draft of the "National Food Safety Standard for Seasoned Flour Products" standard,Spicy strips belong to seasoned noodle products。Although the standard has not yet been officially introduced,But,On the classification,The Health and Family Planning Commission is clear。Enterprises should not be confused with understanding。 2、Attitudes towards local standards: (1) The local standard of a province classifies it as pastry。It was because spicy strips were just emerging as a new food,The country has not yet clarified its classification。 (2) In the case that the high-level authority of the state has made it clear,This standard should be abolished。 (2) The safety and solution of the preservatives involved: 1、security:Safety concerns for preservatives potassium sorbate and sodium dehydroacetate,Rest assured。When I was teaching the students, I explained in detail the rules and principles for setting the limit values in the standard,It is already clear to the classmates,I won't go into detail here。 2、The solution: Since the safety of the two preservatives is no problem,Then the enterprise or location can declare in accordance with the food additive declaration procedures to expand the scope of application。namely,These preservatives are prepared with the necessary documents,Food additives allowed for use in instant rice and flour products,Just make a declaration,When approved to expand the scope of use,before use。 Three、How to deal with unqualified sampling: (1) Since the enterprise has come up with the basis for its implementation standards (landmarks).,Although there is a suspicion of sophistry in the classification,I would like to make two points about how to deal with it:First, it is necessary to impose administrative penalties,Even if the business is litigating,It is certain that the company will lose the lawsuit;Second, it is appropriate to impose administrative penalties in this case,After all, the landmark has not been abolished。The third is the future,The enterprises involved must be scientific、Officially recognized classification organizes production。 (2) Local health and family planning commissions should be abolished in a timely manner、Revise relevant local standards。 (3) At the national level, it is necessary to strengthen supervision at the grassroots level、guide。meantime,Relevant standards should be introduced as soon as possible。 Four、A few final words: I explained the food classification system in detail when I was teaching my students。Simply,Classification system for the standard system,Only applies to this standard,That's the first sentence。The second sentence is:,When the classification is unclear,It is necessary to determine the classification of food according to the characteristics of processing technology and product attributes。The last word is:,Food technology is a lesson that must be made up for today's food law enforcement people - if you don't understand the process, you are a hooligan to talk about law enforcement! Original: Douban reprinted in:FDA

Site Management (Personnel、material、equipment, etc.).

On-site management,It's a very deep science。therefore,Summarizes today's dry goods,Refer to the production site managers of the enterprise for reference。 1、What is a scene? 1、The scene contains two factors: "present" and "field".。 2、"Now" is now,Current meaning,The emphasis is on temporality。 3、The "field" is the place,The meaning of the place,The emphasis is on regionality。 4、"Present" and "field" are combined,It is a specific area that is given a certain amount of time。 5、For manufacturing companies,The site is the production workshop。 2、Walk into the scene 1)The "three busy" phenomenon on the spot:Hectic、blindly、confused。 Hectic:On the surface, everyone is busy,In fact,It's all about doing the redundant,Or what is done is ineffective。(Blind) Blind:Due to being too busy,People always do things mechanically,There is no direction of work,Not very efficient。 confused:Long-term blind work leads to numbness of people's minds,Confusion of consciousness,I don't know what I'm doing all day,It's a mess of everything。 2)The main concern on site is the yield:Analyze the current situation—-Identify bottlenecks—Take action—-Work something out—-Increased yield (display capacity) 3)Features in the field:Output product。 4)A core element of site management:4M1E Personnel (Man):quantity,Post,skill,Qualifications, etc。 Machine):examine,Acceptance,maintenance,maintenance,Calibration Material):Acceptance,quality,Cost Method):Production process,craft,Operational techniques,Operating Criteria Environment):5S,Safe working environment 3、The golden rule of on-site management 1、When a problem (exception) occurs,Go to the site first。 2、Examination of the phenomenon (exhibited characteristics) of the object (related object)。 3、Temporary measures will be taken on the spot。 4、Uncover the real cause and rule it out。 5、Standardize to prevent recurrence。 4、6 basic principles of production activities 1)The post-project is the quality of the customer's work, which is determined by the evaluation of the post-project, and does not accept unqualified,Do not manufacture unqualified,Do not pass on the non-conformance 2)Must-reach production plan annual plan、Monthly plan、daily、Hourly production is scheduled—-Guarantee of production schedule 3)Eliminate waste Waste is something that can be done without doing,There is not the thing which is also possible 4)Standardization of assignments There are standard assignments,Work Guidelines,It's not standardization, it's about making provisions,Comply with and improve this regulation,Keep improving—abide by—Only then can the activities be called standardized。 5Value-added work The purpose of management is to seek greater value-added (profit) The site should have a big picture,Identify production bottlenecks,6) Actively respond to changes Basic requirements——Decide on the basics of work such as standard books,Make it a habit to observe first——Gather intelligence in advance,Take the next step to master the strengths——Improve your skills and expand your strength,Improving equipment utilization, etc 5、Daily work on site 1) On-site quality management How to ensure excellent quality on site? 5 principles to avoid mistakes: a、Cancel this job B、Don't let people do c、Make the job easy d、Check e、Reduced impact 2) Cost management on site The best way to reduce costs,It's about eliminating excessive resource consumption a、Improve quality:The quality of the work process,Reasonable 5Mb、Increase productivity to reduce costs:Continuous improvement c、Reduce inventory:Liquidity、storage、carry、Quality hazards、New product d、Shorten the production line:Reasonable line worker e、Reduced machine downtime f、Reduced space g、The role of the site in reducing the total cost 3) Delivery time One of the main tasks of the manager 4) What should be grasped in the actual operation on the site a、Rationality of production work plans、Production planning with practical difficulties、Impact of Program Adjustments b、Personnel status、Skills of employees、Shutdown caused by lack of material and equipment failure、Countermeasures and treatment of defective products Read More …

Notice of the General Office of the State Administration for Market Regulation on Deepening and Improving the Investigation and Treatment of Hidden Dangers of Special Equipment Related to Hazardous Chemicals

Released: 2018-08-29 15:07 Sources of information:: Notice of the General Office of the State Administration for Market Regulation on Deepening and Improving the Investigation and Governance of Hidden Dangers of Special Equipment Related to Hazardous Chemicals Shi Jian Special [2018] No. 24 of all provinces、Autonomous regions、Quality and Technical Supervision Bureau of the Municipality directly under the Central Government (Market Supervision and Administration Department): In order to further implement the Party Central Committee、The State Council's important decisions and arrangements on strengthening production safety,Implement the key points of special equipment safety supervision and energy-saving supervision in 2018,Consolidate the achievements of the investigation and management of hidden dangers of special equipment related to hazardous chemicals,Strengthen the risk prevention and control of high-risk pressure-bearing special equipment in key areas,The relevant work is hereby notified: One、Consolidate the achievements of the investigation and management of hidden dangers of special equipment related to hazardous chemicals (1) Implement the main responsibility。 The user unit of special equipment related to hazardous chemicals shall implement the main responsibility for the investigation and treatment of hidden dangers of special equipment,Implement various safety management systems,Implement the safety responsibilities of safety management personnel and operators,Effectively carry out hidden danger investigation and management。In accordance with the requirements of the Quality Inspection Office [2017] No. 91,The potential safety hazards that have been identified in the early stage but have not yet been treated,The user unit should take active measures,Strive to complete the treatment of hidden dangers by the end of 2018,Realize closed-loop management of potential safety hazard investigation and management of special equipment。meantime,It is necessary to carry out the investigation of hidden dangers according to the characteristics of the unit, and look back,Eliminate new potential safety hazards in a timely manner。 (2) Strengthen supervision and inspection。 Quality supervision departments (market supervision departments) at all levels should strengthen supervision,Strengthen key supervision and inspection of areas and relevant units where the progress of hidden danger management is slow,Coordinate measures to supervise and urge relevant units to implement hidden danger management,Investigate and deal with violations of laws and regulations in a timely manner,It is a major hidden danger that is difficult to deal with in various places,It should be reported to the local safety committee for supervision。 Two、Strengthen the risk prevention and control of high-risk pressure-bearing special equipment in key areas (1) Special equipment related to "coal-to-gas".。 All localities should strengthen the risk prevention and control and hidden danger investigation and management of special equipment involved in "coal to gas".。To be for the design、fabricate、Weak links in the installation process,Supervise and urge relevant enterprises to strictly implement special equipment regulations and standards,Supervise and urge the inspection agency to implement supervision and inspection in strict accordance with the requirements of the specification。Spot check the design unit、Whether the manufacturing unit and the installation unit strictly implement the safety technical specifications and standards,Whether the installation notification and installation supervision and inspection system are strictly observed,The hidden dangers found should be ordered to be eliminated,against illegal installations、Transformation and failure to declare supervision and inspection should be investigated and dealt with in a timely manner。 (2) Mobile pressure vessels、Gas cylinder filling station and inspection station。 All localities should strictly inspect the implementation of various management systems of filling stations and inspection stations,Check the licensing qualifications of filling stations and inspection stations、Qualifications of filling and inspection personnel,Enterprises with chaotic management should be ordered to carry out rectification。Check whether the gas cylinder filling station is illegally filled with scrap gas cylinders and gas cylinders that have exceeded the inspection period;Check whether the inspection process of the gas cylinder inspection station meets the provisions of the specifications and standards and the defunctionalization of the inspection and judgment waste gas cylinders;Repair of gas cylinder inspection stations、The act of modifying and refurbishing a gas cylinder or cylinder valve,As well as the purchase of gas cylinder valves without a license should be strictly punished in accordance with the law。 (3) Strengthen the management of hidden dangers of oil and gas pipelines in high-consequence areas。 All localities should follow the requirements of the "Notice of the State Administration of Safety Supervision and Other Eight Departments on Strengthening the Safety Management of Oil and Gas Transmission Pipelines, Crowded Places, and High-Probability Areas" (Safety Supervision Supervisor No. 3 [2017] No. 138).,Supervise and urge oil and gas transmission pipeline enterprises to strictly implement relevant laws, regulations and safety technical specifications for special equipment,Implement the statutory inspection system for pipelines in accordance with the law,Further improve the coverage of statutory inspection and in-pipeline inspection of oil and gas pipelines;Supervise and urge oil and gas transmission pipeline enterprises to strengthen the oil and gas transmission pipeline body、Identification of various safety risks of ancillary facilities and surrounding environment、Investigation and management of potential safety hazards,Improve the quality and safety of the pipeline body。 Three、Relevant work requirements (1) Strictly implement work responsibilities。 The provincial quality and technical supervision departments (market supervision and management departments) shall be in accordance with the requirements of the work content and completion time limit,Combined with local realities,Strictly implement work responsibilities。Significant hidden dangers and systemic risks found in the work,Report to the local government and the General Administration in a timely manner。 (2) Do a good job of statistics and summary reporting。 All localities should conscientiously sum up,Do a good job of relevant data statistics。The provincial quality supervision department (market supervision and management department) shall report the completion of the preliminary work and the statistical table (see attached table) to the Special Equipment Bureau of the General Administration before September 5, 2018,Before January 5, 2019, the completion of the work in 2018 and the statistical table will be reported to the Special Equipment Bureau of the General Administration,Before October 30, 2019, the completion of all work and statistical tables will be reported to the Special Equipment Bureau of the General Administration。 Contact person for information reporting:General Administration of Pressure Pipeline Safety Technology Center Yang Yong contact number:010-59068601;fax:010-59068232; Contact email:13810116863@126.com。 State Administration for Market Regulation June 20, 2018